Box System Construction
 
A. Walls / Column

BOX SYSTEM CONSTRUCTION of residential and commercial buildings is greatly changing the atmosphere of construction. This FAST, DURABLE, and COST-EFFICIENT construction method eliminates plastering and redundant CHB walls. This method of construction uses a US Patented Formwork Panels (multiple sizes) that are laid side by side and/or on top of the others to form the core of partitions/walls/columns of any structure. This core is then poured with fresh concrete mix; allowed to set; and stripped. This work cycle generates a fast production of structural building elements (equivalent to plastered shear wall) incomparable with conventional system.

For example, the structural phase (including plastering) of a low cost house with a floor area of 24 to 36 sq. m. with enclosed bathroom, bedroom, and its perimeter walls can be finished in 2 days work cycle, assuming that the soil has been prepared to receive the slab-on-fill: (refer pictures).

What you see on DAY 3 after stripping the US Patented Formwork Panels is a fully-built structural house with precise door and window openings and smooth wall surfaces (both face) that are ready to receive any kind of architectural finishes (painting after drying period).

Large projects like mass housing, big residential houses, multi-storey buildings can be fast tracked by increasing the quantity of these US Patented Formwork Panels.

Unlike the conventional system of construction (CHB are not designed to carry structural loads), this BOX system optimizes the use of walls both as partitions and structural elements. Shift from frame structural resisting elements (footing/column/beam/slab) to box type (grade slab-on-fill/wall/slab) gives the owner better value for his/her investment. Lastly, this structural design and construction concept are made to pass Universal Design Standards and National Building Code.

DAY 1: Surface preparation, rebar, utilities (electrical, mechanical and sanitary embedded items), and pour slab-on-fill.

DAY 2: Rebar, utilities (electrical, mechanical and sanitary embedded items), installation of US Patented Formwork System, and cast core walls/columns.

DAY 3: Fully-built structural house with precise door and window openings and smooth wall surfaces (both face) that are ready to receive any kind of architectural finishes.


B. SUSPENDED SLAB

SYSTEM CONSTRUCTION of Suspended Slab in complimentary with system construction of Wall / Column. It is a fast, straight forward, as well as effective way of completing the BOX structural resisting elements of low to high-rise concrete structures.

Only 4 or limited sturdy pre-standing US Patented Shoring System (capacity = 4 -to10 tons each) together with series of easy-to-install light weight steel beams laid over the other plus the smooth phenolic plywood shall integrate the suspended slab to the system construction of Wall/Column.

This box construction is replicated in different designated sizes side-by-side and/or on top of one another in any case (residential, mass housing, multi-storey buildings) applicable. Structural integrity is checked both for vertical, horizontal, eccentric, bending, torsion and other applicable stresses.

Like the walls, the under side of the slab is smooth, of which ceiling finishes may be eradicated.

DAY 1: Shoring and formwork preparation, including rebar, utilities (electrical, mechanical and sanitary embedded items)
 

DAY 2: Pour slab
 

 

 

 Home | Privacy | About Us | Services | Reference | On-going Projects | Resources | Financial Facilities
Sitemap | Directory | Partners | Contact Us

Copyright © 2006 Northcon.net. All rights reserved
Designed and Optimized by JNB Webpromotion